NEW QUESTION # 18
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?
- A. EU_CLONE MIG SOT RUN
- B. EU CLONE MIG_DT_RUN
- C. EU IMPORT ALL
- D. EU_CLONE MIG_DT_CREATTE
Answer: B
NEW QUESTION # 19
Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.
- A. SAP S/4HANA conversion including DMO
- B. Prerequisite check
- C. DMO without system update
- D. SAP S/4HANA conversion without DMO
- E. Benchmark tool
Answer: A,B,D
NEW QUESTION # 20
You are performing an SAP S/4HANA conversion for your production system. This conversion project requires that certain business functions are switched on. Following SAP recommendations, how will you achieve this? Note: There are 2 correct answers to this question.
- A. Activate the required business functions in the switch framework from section S/4H_ALWAYS_ON_FUNCTIONS.
- B. During conversion, SUM delivers some business functions already activated.
- C. Import a transport request from the development system that contains the recording of the activation.
- D. Activate the required business functions manually in the production system.
Answer: B,C
NEW QUESTION # 21
What are the benefits of using the benchmarking option of the DMO for SUM? Note: There are 2 correct answers to this question.
- A. You can record the modification adjustment during migration and use the transports in the next runs.
- B. You can verify that the content of the download directory matches the stack XMML file.
- C. You can obtain migration duration files from a previous benchmark run that can be used to optimize the next runs.
- D. You can find the optimal number of parallel R3load processes by monitoring host performance.
Answer: C,D
NEW QUESTION # 22
Which preoperational steps must be performed for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
- A. Perform the custom code adjustment.
- B. Install add-on SAP Gateway 7.50.
- C. Delete client 066 (Early-Watch client).
- D. Uninstall SAP Fiori apps NO T released for SAP_UI 7.50.
Answer: C,D
NEW QUESTION # 23
You are planning an SAP S/4HANA conversion.
Which conversion-specific tasks must be performed during the preparation phase?
- A. Run the database migration to the SAP HANA database.
- B. Perform the migration of data to the new data structure.
- C. Solve problems from the simplification item (SI) checks.
- D. Check the compatibility of custom code with SAP S/4HANA.
Answer: D
NEW QUESTION # 24
You are performing an SAP S/4HANA conversion with DMO. You entered a specific number of R3load processes during the Extraction Roadmap step.
Where can you change this during the migration via the Utilities option of the SUM UI?? Note: There are 2 correct answers to this question.
- A. In SUM Analysis
- B. In Process Control Center
- C. In SUM Parameters
- D. In DMO Migration Preparation
Answer: B,C
NEW QUESTION # 25
You are running an SAP ECC system with SAP BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.
- A.
- B.
- C.
- D.
- E.
Answer: A,C,E
NEW QUESTION # 26
You are performing an SAP S/4HAN A conversion with DMO. You are using the downtime-optimized data conversion (DoC).
Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.
- A. Conversion
- B. Main import
- C. Migration
- D. Software update
Answer: A,C
NEW QUESTION # 27
During the upgrade of your development system, you run into the adjustment of non-dictionary objects, handled by transaction SPAAU. There you find programs that are shown in status "automatic adjustment" (green traffic light).
What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?
- A. SUM refuses to continue unless you have marked a transport request as modification adjustment transport.
- B. SUM continues with the next phase and your modifications are kept as in the start release.
- C. Before continuing with the next phase, SUM asks for a modification adjustment transport.
- D. SUM continues with the next phase, and the coding of your modified objects are set to the new SAP standard.
Answer: C
NEW QUESTION # 28
You have selected "Standard" as scenario strategy in the SUM tool.
Which steps take place via the shadow instance? Note: There are 2 correct answers to this question.
- A. Conversion of application tables (PARCONV_UPG)
- B. Modification adjustment (SPAU)
- C. Modification adjustment (SPDD)
- D. Activation of dictionary objects (ACT_UPG)
Answer: C,D
NEW QUESTION # 29
How does SUM recognize modification adjustment transports from predecessor systems?
- A. By searching for transport requests in file umodauto.lst
- B. By searching for transport requests that are assigned to project SAP ADJUST
- C. By searching for transport requests in DIR_TRANS, subdirectory "transport"
- D. By searching for transport requests named <sid>KO<number>
Answer: A
NEW QUESTION # 30
You are performing an SAP S/4HANA conversion with scenario strategy Standard. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question.
- A. PARMVNT_UPG
- B. PARDIST_SHD
- C. TABIM_SHADOW_INC
- D. TABIM UPG
Answer: A,D
NEW QUESTION # 31
Which step can be optimized when you provide the MIGRATE_DT_DURXML file to SUMM?
- A. Silent data migration (SDM)
- B. Downtime migration
- C. Shadow on target creation
- D. Downtime conversion
Answer: B
NEW QUESTION # 32
You want to perform an SAP S/4HANA conversion using SUM with in place DMO.
Which steps run before the beginning of the technical downtime, irrespective of your SUM configuration? Note: There are 3 correct answers to this question.
- A. Generation of the new ABAAP loads in phase RUN_SGEN_GENERB
- B. Import of dictionary objects from the download directory in phase DDIC_UPG
- C. Import of upgrade and language data from the download directory in phase TAABIM UPG
- D. Creation of application tables in the SAP HANA database in phase
- E. Activation of dictionary objects in phase ACT_UPG
Answer: B,C,E
NEW QUESTION # 33
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
- A. The Si checks are executed in the development system and the results are transported into the subsequent systems.
- B. The errors from the SI checks must be solved; otherwise, SUM will report an error.
- C. You need an SAP system based on AS ABAP 7.52 or above for the SI check framework.
- D. You need to build up an SI check framework by applying SAP Notes.
Answer: B,D