Authentic Best resources for API-1169 Test Engine Practice Exam [Q190-Q207]

Share

Authentic Best resources for API-1169 Test Engine Practice Exam

[2026] API-1169 PDF Questions - Perfect Prospect To Go With PassExamDumps Practice Exam

NEW QUESTION # 190
Which document includes within its scope pipe-type storage tanks fabricated from pipe and fittings?

  • A. 75 / 25
  • B. B16.34
  • C. 5 / 50
  • D. Api 1104

Answer: C


NEW QUESTION # 191
During welding, a good practice to reduce the generation of fumes and gases from paints and primers is to ___________________.

  • A. grind or sand the surface to bare metal prior to welding.
  • B. 30 % or more of SMYS
  • C. No, this is a change to an essential variable, requalify.
  • D. 100 ft

Answer: A


NEW QUESTION # 192
Trench ratio for soil type A

  • A. 3/4:1
  • B. 5/1
  • C. 1/2:1
  • D. 1 1/2:1

Answer: B


NEW QUESTION # 193
Trench ratio for soil type C

  • A. 1 1/2: 1
  • B. 3/4: 1
  • C. 1 1/2: 5
  • D. 1 1/2: 6

Answer: D


NEW QUESTION # 194
_______________ must be made for ___________ tidewater from construction/extention of piers, wharfs, etc.

  • A. compensation/displaced
  • B. 5 / 50
  • C. 75 / 25
  • D. clearing

Answer: A


NEW QUESTION # 195
The Hazardous Material Table designates materials listed therein

  • A. Materials and material handling
  • B. For the purpose of listing materials category
  • C. Danger - High Pressure, Testing in progress
  • D. Coating condition of the pipe

Answer: A


NEW QUESTION # 196
RCA

  • A. Material Transfer Form
  • B. Root Cause Analysis
  • C. Process Management
  • D. Resolved

Answer: B


NEW QUESTION # 197
The cross company will identify areas where blasting will be used along the route within how many feet of the existing facilities to be crossed?

  • A. Action to illuminate the cause of a potential nonconformity or other potential undesirable situation.(Preventative action is taken to prevent occurrence were as correct of action is taken to prevent recurrence)(ISO 9000 3.12.1)
  • B. 300, (the members recognize this guideline differs from the one contained in the API,s "Guidelines for Property Development" that specifies a hosting plan is required when blasting will occur within a (1/4) mile of existing facilities.
  • C. Efforts to notify the excavator by phone, email, or using a contact card on a string, or other comparable method, on the door handle, or steering wheel, of the subject equipment.
  • D. Is the vertical separation between the existing pipeline and facilities and where the new pipeline is being installed. The recommended crossing clearance distance between the new pipeline and the existing facilities is two feet (24"). The minimum distance is one foot (12"). The new pipeline should be installed at a level depth across the ROW, if practicable.

Answer: B


NEW QUESTION # 198
When a ditch for a pipeline is filled, it must be done so that it provides what for the pipeline?

  • A. it provides proper support for the pipe and prevents damage to the pipe and its coating
  • B. Site Specific test procedure
  • C. A vertical line in the back of the ears
  • D. Verify that the limits of authorized construction work areas and access roads are abided by

Answer: C


NEW QUESTION # 199
Oxygen deficiencies/excess are where oxygen levels are below______ or above _____.

  • A. 10.0% and 19.5%
  • B. 18.5% and 21.5%
  • C. 23.5% and 50.0%
  • D. 19.5% and 23.5%

Answer: D


NEW QUESTION # 200
What procedure has these topics as some of it,s sections:
-Welding procedures
-Miter joints
-Repairs of steel pipe
-Bends and Elbows
-Casing
-Cover

  • A. 49 Cfr 187
  • B. 51 Cfr 192
  • C. 40 Cfr 300
  • D. 49 CFR 192

Answer: D


NEW QUESTION # 201
If the ends of an unvented casing are sealed and the sealing is strong enough to retain the MAOP, the casing must be designed to hold this pressure at a stress level of not more than ________ % of________.
49 CFR 192.323

  • A. 67/smys
  • B. 72/SMYS
  • C. 5 / 50
  • D. 49 cfr 192.505

Answer: C


NEW QUESTION # 202
What 2 procedures discuss Welding

  • A. 849 cfr 192.505
  • B. 49 CFR 192 and 1104
  • C. 49 Cfr 192.325 and 192.250
  • D. 0

Answer: C


NEW QUESTION # 203
4 instruments used to inspect field bends

  • A. Grading
  • B. Protractor, Measuring tape, Center Finder, Straight edge.
  • C. Gouges, buckles, wrinkles, ripples or ovality,s
  • D. Crossing plan

Answer: B


NEW QUESTION # 204
29 CFR Part 1910

  • A. Class 1 liquids having a flash point below 100 deg F. Gasoline.
  • B. Regulation Occupational Safety and Health Standards
  • C. Spill Prevention Control and Containment
  • D. Naturally occurring radioactive materials

Answer: D


NEW QUESTION # 205
when storing fuel near a wetland/environmentaly site, what 2 forms of containment are necessary?

  • A. impressed current
  • B. containment only
  • C. containment and secondary containment
  • D. site specific test procedure

Answer: D


NEW QUESTION # 206
What type of signs need to be posted during Hydro/Pressure Testing?

  • A. Adequacy, completeness and lack of conflict.
  • B. Required reporting
  • C. Strength pressure test
  • D. Danger - High Pressure, Testing in progress

Answer: D


NEW QUESTION # 207
......

Best updated resource for API-1169 Online Practice Exam: https://www.passexamdumps.com/API-1169-valid-exam-dumps.html